The Tribute Hotel in 's-Hertogenbosch is a 5-star hotel (approximately 160 rooms) with two restaurants, including a rooftop restaurant, various meeting facilities, and a fitness center.
The Tribute Hotel in 's-Hertogenbosch is a 5-star hotel (approximately 160 rooms) with two restaurants, including a rooftop restaurant, various meeting facilities, and a fitness center.
Hotel The Den is the ultimate lifestyle hotel in 's-Hertogenbosch, a franchise of Marriott International and part of the Odyssey Hotel Group. The hotel features 160 rooms, including a casual restaurant and bar on the ground floor, a rooftop bar, and a rooftop restaurant. It also offers 5 meeting rooms and an extensive 150m² gym. Centrally located in the city near the Central Station, The Den provides a vibrant accommodation option in Den Bosch.
2. Byldis contribution to this project
In total, we supplied approximately 300 facade elements for the Tribute Hotel in 's-Hertogenbosch, as well as all floors and interior walls of the building. Starting from the second floor (hotel rooms), the entire structure was built using prefabricated elements.
3. Why was Byldis chosen?
An important reason for choosing Byldis’ precast panels for the Tribute Hotel ’s-Hertogenbosch project is the construction time. We are able to construct the building, from start to finish, in just 135 days. A deciding factor was the proven added value of the Byldis total concept. As everything is delivered ready-made, including frames, windows and outer facade, a building can be constructed much faster. Our construction method means that these buildings can be constructed in a little over half the time needed for a traditional construction process.
4. Challenges & solutions
The construction site
The challenge for us with this project is that the Tribute Hotel ’s-Hertogenbosch is being built alongside the existing paleis bridge. The hotel will be built up against it. This also makes accessibility more difficult. The tight construction site means that the crane only just fits on site. A challenge for Byldis to build here.
Masonry
Two different kinds of brick will be used in the masonry work, with a complicated masonry pattern. A special mould has been made for these facade elements. The bricks will be set back, so that the pattern deviates from a standard pattern.
5. Facts & figures
The project
Hotel and office
Location
's-Hertogenbosch, The Netherlands
Scope of project
60 metres high / 9,000 m2 floor surface area
Byldis contribution
Engineering
floors
internal walls
stairways and landings
frames
curtain walls
Byldis expertise involved
Byldis total concept (engineering, precast concrete, aluminium facades)
Start production Byldis
September 2019
Start assembly Byldis
August 2020
Completion Byldis
March 2021
Client
Built to Build
Architect
PBV Architects
6. Footage
In production, the storey-high elements was assembled in a u-shape and fitted with glass and panels. These elements were placed completely by crane on the building site. In this way, a building can be made glass-tight very quickly and completion can start earlier. The during construction photos were taken on 21 April 2021:
Engineering, floors, internal walls, stairways and landings, frames,
curtain walls